Place of Origin:
CHINA
Brand Name:
CNLN
Certification:
CE/ISO
Model Number:
CJ61F
Short Stem SS304 SS316 DN10 to DN100 Low Temperature Globe Valve
Product Description
General Description
Cryogenic Globe Valve Stainless Steel Cryogenic Globe Valve
Features of Stainless Steel Cryogenic Globe Valves:
This type is special low-temperature short-stem valve is mainly used for low temperature storage tank,
tank car and tank car step-down system, widely used in LNG, ethylene and other low temperature liquid medium,
with reliable sealing, action quick, the characteristics of the pressure is stable and reliable, and anti-static.
Name: Short stem globe valve |
|
Main technical parameters: |
Nominal diameter: DN10-250mm |
Nominal Pressure: PN4.0MPa |
|
Applicable medium: O2, N2, Ar, LNG |
|
Applicable temperature: -80℃~+80℃ |
|
Connecting format: |
|
Material: |
Body: CF8 |
Bonnet: 06Cr19NI10 |
|
Stem: 06Cr19NI10 |
|
Packing: PTFE |
|
Disc face ring:PCTFE |
For your company to order valve products in our company, our factory makes the following commitments in terms of after-sales service:
1. Our company implements warranty on product quality;
2. After the contract is signed, guarantee the quality and quantity, and deliver on time;
3. The company ensures that the valve products provided meet the contract targets
4. For technical consultation of the demand side, give answers at any time;
5. When delivering the equipment, the factory delivers the following materials to the purchaser: delivery list, product certificate, product sample, product instruction manual, technical information;
After receiving a letter or a phone call from the user regarding quality issues, we guarantee a response within 24 hours to resolve the issue as quickly as possible
Drawing
Notes When Use
1 . It should ensure that the pipe is blown clean before installation.
2 . When installing, make sure that the flow direction indicated by the arrow on the valve body should be consistent with the flow direction of the fluid.
3 . This valve has been degreased. Store and keep clean when installing.
4 . After the pipeline construction is completed, all the valves on the pipeline should be opened, and the residue in the pipeline should be thoroughly and thoroughly kept to ensure that the pipeline system is clean and free of debris.
5 . The installation system diagram with the oil-free requirements should be degreased.
6 . Slowly open and close during use.
7 . If the precision parts such as the valve disc, valve seat and valve stem are worn or damaged, it must be repaired and replaced in time.
8 . For parts such as gaskets and sealing materials, replace them with new ones each time.
Send your inquiry directly to us